About The Project
For this project we carried out a full renovation including a second story extension.
All rooms were stripped right back and re-skimmed. A wall was taken out between the living room and kitchen to create a modern, open plan living space. The bedroom layouts were altered to create a 4th bedroom. There was a extension added to the master bedroom, along with en-suite. All this was carried out in a very quick 10 week time frame.
All rooms were stripped right back and re-skimmed. A wall was taken out between the living room and kitchen to create a modern, open plan living space. The bedroom layouts were altered to create a 4th bedroom. There was a extension added to the master bedroom, along with en-suite. All this was carried out in a very quick 10 week time frame.